May 21
Home Up January 1 January 14 January 25 April 25 May 21 May 29 July 4 August 14 September 5 Setember 19 September 26 November 30 December 12 December 18 December 31

 

I spent several days making this cut. It is a little over 400 foot long, and about 14 inches deep. This area is where the dirt was not taken to build the power line road and turn.  Water was impounded on the north end in the foreground of the picture, and there was a large low spot on the south end. The water was a little over 12 inches deep at the north end, and about 8 inches deep at the south end in the low spot. The swale going down the south line may need to be a bit deeper. I will wait for the water to let me know what needs to be done.

I made this cut using the box blade.  The area was low at both ends and high in the middle. I cut a path for the water to go to the south line. The dirt was spread at both ends in low spots to try to even things out.
Black berries are in season and Cindy wanted to pick some before we headed home.
The picking is quite nice
It took her just a few minutes to get this many.