Finished the rip rap on one side of the trail crossing today. It took us two
days, since we were both not feeling well. We ended up with 8 bags of concrete
left out of a complete pallet. It was a little harder to build this one, as the
culvert is at an angle to the rip rap. With a little engineering we succeeded.
 |
Cindy resting on the final product. |
 |
We used the tractor to pull the trailer with a pallet of concrete.
It sure was nice to see it almost empty, ready to haul the tools back to
the barn. |
 |
After a hard day of work, Gary relaxes with a cool drink and a soft
cow. |
|